PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Low roof storm piping at the 4th floor Facing West.jpg Started the 3rd floor interior metal framing Facing West.jpg Erecting the stone panels at the East Elevation 5.jpg Erecting the stone panels at the East Elevation 6.jpg Split wire above the ceiling at the 2nd floor Facing South.jpg
Previous page Split wire above the ceiling at the 2nd floor Facing South
Split wire above the ceiling at the 2nd floor Facing South